Response of lateral channel dynamics of a lowland meandering river to engineering-derived adjustments - an example of the Morava River (Czech Republic)

Varování

Publikace nespadá pod Ústav výpočetní techniky, ale pod Přírodovědeckou fakultu. Oficiální stránka publikace je na webu muni.cz.
Autoři

ONDRUCH Jakub MÁČKA Zdeněk

Rok publikování 2015
Druh Článek v odborném periodiku
Časopis / Zdroj Open Geosciences
Fakulta / Pracoviště MU

Přírodovědecká fakulta

Citace
www http://www.degruyter.com/view/j/geo.2015.7.issue-1/geo-2015-0047/geo-2015-0047.xml?format=INT
Doi http://dx.doi.org/10.1515/geo-2015-0047
Obor Zemský magnetismus, geodesie, geografie
Klíčová slova meandering rivers; channel planform changes; river regulation; GIS; Morava River
Popis Freely meandering (quasi)natural reaches of lowland rivers represent a rare phenomenon in Central Eu- rope. Increasing attention is currently being paid to the dynamics of quasi-natural (articially inuenced) mean- dering rivers as this attention represents the basic pre- requisite for the development of appropriate restoration strategies on regulated rivers. This study focused on a 5.5 km long reach of the Morava River in the Strážnické Po- moraví region, Czech Republic that is characterised by quasi-natural evolution after substantial engineering ad- justments were made in the rst decades of the twentieth century. Based on Geographic Information Systems (GIS) analysis of aerial photographs, the spatio-temporal dy- namics of bank erosion and accretion rates were quantita- tively described and variables that control channel migra- tion rates were identied. High rates of lateral shifts were localised in high sinuosity segments (sinuosity 1.17-2.37), whereas segments with very low rates were straight or formed into slightly curved bends (sinuosity 1.05-1.18). As a key factor, engineering works that inuenced local river bed slope and induced a dramatic increase in bank erosion rates were identied. River engineering works induced a dramatic increase in bank erosion rate (2.19 m/year for 1938-53 and 1.47 m/year for 1953-63). An interval of ap- proximately 25 years was needed before the erosion rates dropped back to values documented before river regula- tion (0.35-1.09 m/year for 1841-1938). Other important con- trolling variables included radius of curvature, frequency and magnitude of oods and, locally, river bank material properties and oodplain land cover.
Související projekty:

Používáte starou verzi internetového prohlížeče. Doporučujeme aktualizovat Váš prohlížeč na nejnovější verzi.

Další info